| Project: Construction of Electric Powered Rail track. |
|

|
Location: Elefsina, Attiki, Greece.
|
| Construction Period: 1992 |
| Client: Greek Shipyards |
Turnover:
100.000.000 drs
293.500 €
|
| Technical Description: Highway Engineering and Industrial Construction Works. |