Project: Design and Build of the Reconstruction of an Old Tannering Building. |
|
|
Location: Borough of St. I. Rentis
|
Construction Period: 1997-1998 |
Client: Borough of St. I. Rentis |
Turnover:
310.000.000 drs
910.000 €
|
Technical Description: Design & Build, Refurbishment, Building and E/M Works. |